Newsflash

SDSS make it easier for you. Project management, documentation and validation, standardisation, software, hardware and more, we do it all! You can rely on us to deliver your required automation solution on time and within budget (due allowance for extras). We reserve the right to decline work if we would not be able to perform to our clients expectations and within their timescales

Syndicate

feed-image Feed Entries
Home News

Latest News


Warning: Creating default object from empty value in /home3/sdsystem/public_html/sdss/modules/mod_latestnews/helper.php on line 109

Warning: Creating default object from empty value in /home3/sdsystem/public_html/sdss/modules/mod_latestnews/helper.php on line 109

Warning: Creating default object from empty value in /home3/sdsystem/public_html/sdss/modules/mod_latestnews/helper.php on line 109

Warning: Creating default object from empty value in /home3/sdsystem/public_html/sdss/modules/mod_latestnews/helper.php on line 109

Warning: Creating default object from empty value in /home3/sdsystem/public_html/sdss/modules/mod_latestnews/helper.php on line 109

Popular


Warning: Creating default object from empty value in /home3/sdsystem/public_html/sdss/modules/mod_mostread/helper.php on line 79

Warning: Creating default object from empty value in /home3/sdsystem/public_html/sdss/modules/mod_mostread/helper.php on line 79

Warning: Creating default object from empty value in /home3/sdsystem/public_html/sdss/modules/mod_mostread/helper.php on line 79

Warning: Creating default object from empty value in /home3/sdsystem/public_html/sdss/modules/mod_mostread/helper.php on line 79

Warning: Creating default object from empty value in /home3/sdsystem/public_html/sdss/modules/mod_mostread/helper.php on line 79
The News
RTP EMS PDF Print E-mail

SDSS completes system review and transfer of support of RTP Environmental Monitoring System.

1. System fully reviewed and performance and 20+ performance and related issues/errors reported.

2. iFix .H04 and .H24 historical data imported into the Enterprise Storage System while maintaining its validated status

3. Increased reporting performance -  50 fold (optimising of database queries). 20 minutes reports now taking less than 20 seconds.

4. All other errors fixed or solutions put in place.

5. RTP awarded 24-7 support contract to SDSS

6. 24-7 automatic monitoring system put in place to page or SMS on Call Engineer(s) in the event of Server, Operating System, Data Capture and other related failures

 
IP21 Upgrade PDF Print E-mail

SDSS complete the upgrade of 6 validated Aspen Manufacturing Suite Sites (IP21, Production Manager, etc) from Version 2006.5 to AMS V7.3.0.3 together with test and development environments - 10 Servers.

The upgrade included operating system upgrades from Windows 2003 Server to Windows 2008 R2 (64-bit).  All sites UK and US were upgraded remotely with minimal downtime to the connected plant.

All Aspen Cimio Servers were also updated at the same time (1-5 per site).

 
Automated Data Extraction PDF Print E-mail

SDSS are pleased to announce the completion of a compliant data extraction tool. The tool extracts data from IP.21 and Production Record Manager directly into Simca-P. Maintaining data integrity and compliance.

 
SPA Phases 3,4 and 5 PDF Print E-mail

SDSS completes RTP Phases 3,4 and 5. Starts on Phase 6

SDSS continue ongoing work extending the RTP GSK research development SCADA network, adding new additional pieces of equipment to the existing iFix SCADA system and IP21 system.

 
Beanair Wireless System PDF Print E-mail

SDSS are pleased to announce the successful installation of a validated wireless EMS system to collect temperature information from mobile fridges and freezers.  The system collects data from autonomous battery powered devices via a series of gateways that are connected to a PCS7 EMS system via Ethernet, for environmental alarm management and paging/emailing of out of specification devices.

Each device has a battery life of >365 days (2yrs at configured logging frequency) and replacement is handled as part of annual calibration of the sensors.  The installed sensors contain integrated data loggers and these can store up to 16K entries in the event of a Gateway or any other failure. This allows the facility to be certain that critical storage temperature data will be available. (Humidity, Light, Pressure also available)

The Wireless devices installed are Beanair EcoSensor temperature “plug and play devices” (SUN_T).  They provide a low cost implementation with high reliability.  The embedded log feature enables the devices to double as standalone dataloggers.

The low cost of ownership of the devices make them ideal for applications such as; Building management, Embedded process measurement, Chilled Transport Temperature Tracking.

The system comes with its own installable application that can be easily integrated to other systems using OPC DA.

www.beanair.com

 
<< Start < Prev 1 2 3 Next > End >>

Page 1 of 3